We like to keep things simple. From the first chat to the day we hand over your new system, you’ll deal with the same friendly team, and you’ll always know what’s happening next.

We look after the whole project for you: site inspection, design, one clear quote, installation, commissioning, training and ongoing support. LED, sound, controls and installation all come together in one itemised document, so there’s only ever one team to talk to.

The seven steps below are how every project runs, whether it’s a school hall, a lecture theatre, a boardroom or a church.

Seven steps

From first visit to ongoing support

Site inspection

Every project starts with a site inspection. We measure the room, check sightlines, mounting options and power, note the light, listen for acoustic problems, and talk to the people who use the space about how it’s really used. In South-East Queensland we can usually be on site within 48 hours. Further afield, our Site Inspection Form takes around 30 minutes and gives us what we need, with a site visit built into the plan where it’s needed. See what to expect at your first meeting.

Design

One design covering the display (size, pixel pitch and mounting), the sound (speaker placement, amplifiers and processing), the controls and the cabling path. It’s one design, not three. We also flag any work that needs to happen alongside, such as a structural mount, a power upgrade or a cable tray, so it’s booked well before install day rather than discovered on the day.

One clear quote

You get one document listing every part, every service and every installation cost, written in plain English and ready to take to approval. Your business manager can pass it straight on, and your IT team can check every item. If you already have a request for quote template, we’re happy to quote in your format.

Planning and delivery

Once you’re ready to go, we lock in an install date that suits you. Then we take care of the coordination: ordering and delivery of the LED panels and sound equipment, scheduling our team, and working with your facilities and IT staff, builders, electricians or other trades on site so everyone’s on the same page. We’ll check power and mounting points ahead of time and walk you through the install plan, so you know exactly what’s happening and when.

Installation

Our own skilled team handles LED mounting, speaker placement, control wiring, cabling, programming and system tuning, so the people who planned your project are the people who install it. We work around school hours where the venue needs to stay in use, and after-hours, weekend and school holiday installs are all normal for us.

Commissioning and training

Once everything is in, we commission the system: tuning the sound to the room, calibrating the LED, and testing every input and preset your team will actually use. Then we train your venue operators, IT team and any staff who’ll run the room, with a hands-on walkthrough of the control panel, mixer, source switching and everyday workflows. You’ll also receive a plain-English operating guide.

Ongoing support

Every install includes a clear support pathway: who to call, what to send if something isn’t right, and how quickly we’ll get you running again. Equipment warranties follow the manufacturer’s terms, and the warranty on our installation work is set out in your handover pack. Service level agreements are available if you’d like ongoing peace of mind.

Getting started

Your first meeting and site inspection

Here’s how it works. Once you’ve been in touch, we’ll send you a link to our online booking system. Your site inspection is free, with no obligation. It’s a relaxed visit where we get to know your space and what you’d like it to do. Most inspections take around 30 minutes, and complex systems can take up to an hour.

What to expect on the day

Book a time that suits you

Once you’ve been in touch, we’ll send you a link to our online booking system so you can choose a date and time that works for you. It’s best when no one is using the space, so we can clearly assess the room and its acoustics.

Meet, greet and sign in

We’ll introduce ourselves and sign in at your front office or reception.

Walk the space and talk it through

You show us the space and tell us what you need from it, whether that’s events, assemblies, services or presentations. The more you can share, the better we can tailor the solution to you.

Physical inspection and assessment

We measure, photograph and assess the space, including viewing distances, mounting points, power, cabling routes and access, so our recommendation fits your space perfectly.

Sign out and we’re done

A quick wrap-up of what happens next, then we sign out and get out of your way.

A little further away? If you’re outside South-East Queensland, our Site Inspection Form makes it easy to share what we need. With a little groundwork from your team it takes around 30 minutes, and where a visit makes sense we’ll build it into the plan. See Regional Queensland, Remote Queensland and Northern NSW.

Done properly

The standards behind the workWhat “carried out to Australian standards” means on a Team LED project

You shouldn’t have to take “to Australian standards” on trust. These are the main rules and standards that shape an LED and AV install, and how we work with each of them. Screen sizes and pixel pitch are worked out from your real viewing distances using AVIXA’s image size standard, and every system is tested and documented before handover.

AS/NZS 3000

Power and electrical

Fixed wiring and dedicated circuits for your display are installed by licensed electrical contractors to the Wiring Rules. LED power supplies draw a surge at switch-on, so circuit protection is specified to suit, and larger walls are powered up in stages.

AS/CA S009

Data and AV cabling

Fixed data and communications cabling is installed by registered cablers to the ACMA Wiring Rules: kept clear of power, labelled and tested.

NCC · AS/NZS 1170.2

Mounting and structure

Most LED walls go up on the manufacturer’s rated mounting system. For bigger or more complex installs, and for outdoor signs and pylons that have to handle wind, we bring in a structural engineer for design and sign-off.

NCC D4D8 · AS 1428.5

Hearing augmentation

The National Construction Code calls for hearing augmentation in halls, auditoriums and meeting rooms that have a built-in sound system. We design it in and integrate it with your sound system, so it’s part of the project rather than discovered at sign-off.

AS/NZS 2107

Room acoustics

The recommended reverberation times and background sound levels for each type of room give us a reference point when we assess a hall and plan acoustic treatment.

ACMA class licence

Wireless microphones

Wireless microphones share spectrum with TV broadcasting. We choose systems that operate in the bands ACMA permits and check which channels are clear at your site, so they keep working year after year.

Standards are revised from time to time. We work to the current editions.

The Team LED way

Why one team matters

When one team designs, installs and supports your system, everything is planned to work together from day one. You have one contact who knows your project inside out, we work to the install date we agreed, and help is always just one phone call away.

FAQs

Frequently asked questions

Is the site inspection really free?

Yes. It’s free and there’s no obligation.

How long does a site inspection take?

Most inspections take around 30 minutes. More complex systems can take up to an hour. It’s best to book a time when no one is using the space, so we can clearly assess the room and its acoustics.

Who should be there?

Whoever knows best how the space is used, such as your business manager, facilities or IT manager, or the person who runs events. It also helps to have someone with keys to adjoining rooms and the electrical switchboard.

What happens after the site inspection?

We aim to get back to you within 24 hours with a quote, your completed site inspection report and a visual render of your space. Our quotes are modular, so they can be built around your requirements and budget.

Can you work around our timetable?

Yes. We plan the install around your terms, events and services, and after-hours, weekend and holiday installs are all normal for us. We’ll agree the timing with you well before we start.

Do you provide one quote or several?

One quote. LED, sound, controls, installation, commissioning and training are all itemised in a single document, ready to take to approval.

Who does the installation?

Our own skilled and trained technicians. The team that plans your project is the team that installs it.

Can you quote in our format?

Yes. If you have a request for quote template or a specific format, we’re happy to quote inside it.

What training do we get?

Training is part of commissioning. Your venue operators, IT team and any staff who’ll run the room get a hands-on walkthrough of the controls, mixer, source switching and everyday workflows, plus a plain-English operating guide.

What happens if something stops working?

You’ll have a clear support pathway from handover: who to call and what to send. Equipment warranties follow the manufacturer’s terms, and the warranty on our work is in your handover pack.